GETO - General Exchange Tariff Options Code

Identifies the requirement for non-tariff or secondary tariff options in conjunction with the access service and special arrangements (third party billing).

VALID ENTRIES:

 

A

=

Provide inside wiring plan and bill the end user agent

 

B

=

Provide site conditioning and bill the customer.

 

D

=

Provide inside wiring site conditioning and bill the customer.

 

E

=

Provide inside wiring and bill the end user agent

 

F

=

Provide entrance facility from curb to minimum point of entry and bill the customer.

 

G

=

Provide site conditioning, entrance facility from curb to Minimum Point Of Entry (MPOE) and bill the customer. 

 

H

=

Provide entrance facility from curb to Minimum Point Of Entry (MPOE) and inside wiring and bill the customer

 

I

=

Provide inside wiring, site conditioning entrance facility from curb to Minimum Point Of Entry (MPOE) and bill the customer.

 

M

=

Control facility required in conjunction with transfer arrangement or similar such configurations in conjunction with a multi-line hunt group.

 

N

=

Terminate in a location other than normal (extend the point of termination using house cable, etc.) at the end user premises.

 

O

=

Other

 

P

=

Wire only with existing access service and bill end user directly.

 

R

=

Referral for inside wiring (provider to negotiate with the end user).

 

S

=

Provide inside wire repair plan and bill the customer.

 

T

=

Provide inside wire repair plan and bill the end user.

 

U

=

Provide inside wiring and repair plan and bill the customer.

 

V

=

Provide inside wiring and repair plan and bill the end user.

 

W

=

Provide inside wiring and bill the customer.

 

Y

=

Provide inside wiring and bill end user directly.

 

Z

=

Provide inside wiring and repair plan and bill the end user agent

       

 

NOTE 1: Inside wiring may be provided in provider Intrastate tariffs or in an unregulated environment.

NOTE 2: Inside wiring may include cabling, termination panels, media convertors, and labor.

NOTE 3: Site conditioning may include backboard, grounding, and power.

NOTE 4: When the GETO field is “N”, the AAI field on the SALI Form may be used to specify details.

NOTE 5: When the GETO field is “O”, specify requirements in the REMARKS field.

NOTE 6: When the valid entry is other than “B”, “D”, “F”, “G”, “H”, “I”, “N”, “S”, “U”, or “W”, the General Exchange Tariff Options Contact Name (GCON) field must be populated.

USAGE: This field is conditional.

NOTE 1: Prohibited when the UNE field on the ASR Form is populated, otherwise optional.

DATA CHARACTERISTICS: 1 alpha character

EXAMPLE:

R