Identifies a different desired due date to an OEC other than the DDD on the ASR Form. The different date may be necessary due to the coordination of facility specific activity on another EC’s portion of the circuit path.
VALID ENTRIES: |
||
|
U.S. Standard |
Metric Format |
|
Two Digit Month (01-12) |
Two Digit Century (00-99) |
|
Two Digit Day (01-31) |
Two Digit Year (00-99) |
|
Two Digit Century (00-99) |
Two Digit Month (01-12) |
|
Two Digit Year (00-99) |
Two Digit Day (01-31) |
NOTE 1: This field must be different from the DDD on the associated ASR Form.
USAGE: This field is conditional.
NOTE 1: Optional when the ACT field on the ASR Form is “D” and the ASC-EC and RPON fields are populated on the ASR Form, otherwise prohibited.
DATA CHARACTERISTICS: 10 alpha/numeric character (including 2 hyphens)
EXAMPLES: |
0 |
3 |
- |
0 |
2 |
- |
2 |
0 |
1 |
9 |
|
2 |
0 |
1 |
9 |
- |
0 |
3 |
- |
0 |
2 |