GETO - General Exchange Tariff Options Code (PRILOC)

Identifies the requirement for non-tariff or secondary tariff options and special arrangements (third party billing) in conjunction with the access service.

VALID ENTRIES:

 

A

=

Provide inside wiring plan and bill the end user agent.

 

B

=

Provide site conditioning and bill the customer. 

 

D

=

Provide inside wiring, site conditioning and bill the customer. 

 

E

=

Provide inside wiring and bill the end user agent.

 

F

=

Provide entrance facility from curb to Minimum Point Of Entry (MPOE) and bill the customer.

 

G

=

Provide site conditioning, entrance facility from curb to Minimum Point Of Entry (MPOE) and bill the customer. 

 

H

=

Provide entrance facility from curb to Minimum Point Of Entry (MPOE) and inside wiring and bill the customer

 

I

=

Provide inside wiring, site conditioning, entrance facility from curb to Minimum Point Of Entry (MPOE) and bill the customer.

 

M

=

Control facility required in conjunction with transfer arrangement or similar such configurations in conjunction with a multi-line hunt group.

 

N

=

Terminate in a location other than normal (extend the point of termination using house cable, etc.) at the end user premises.

 

O

=

Other

 

P

=

Wire only with existing access service and bill end user directly.

 

R

=

Referral for inside wiring (provider to negotiate with the end user).

 

S

=

Provide inside wire repair plan and bill the customer.

 

T

=

Provide inside wire repair plan and bill the end user.

 

U

=

Provide inside wiring and repair plan and bill the customer.

 

V

=

Provide inside wiring and repair plan and bill the end user.

 

W

=

Provide inside wiring and bill the customer.

 

Y

=

Provide inside wiring and bill end user directly.

 

Z

=

Provide inside wiring and repair plan and bill the end user agent.

       

 

NOTE 1: Inside wiring may be provided in provider Intrastate tariffs or in an unregulated environment.

NOTE 2: Inside wiring may include cabling, termination panels, media convertors, and labor.

NOTE 3: Site conditioning may include backboard, grounding, and power.

NOTE 4: When the GETO field is “N”, the AAI field on the SALI Form may be used to specify details.

NOTE 5: When the GETO field is “O”, specify requirements in the REMARKS field.

NOTE 6: When the valid entry is other than “B”, “D”, “F”, “G”, “H”, “I”, “N”, “S”, “U” or “W”, the GCON (PRILOC) field must be populated.

NOTE 7: Use of valid entries is based on provider tariffs/practices.

USAGE: This field is optional.

DATA CHARACTERISTICS: 1 alpha character

EXAMPLE:

R